Installation of a new condenser includes the following:
- * New condenser pad installed with the unit (if required).
- * Liquid line drier to keep the refrigerant clean.
- * New electrical whip from disconnect to the condenser (if required)
- * 15% silver solder to tie in all copper.
- * Insulated suction line with weatherproof tape to seal and meet 2003 IC.
- * Refrigerant required for balancing the system after deep vacuum service to system.
- * Electrical check out of proper amp draw.
- * Hard start kit if required.
* New electrical disconnect installed to meet code if required.
- * Haul away all old equipment
-
Installation of a new Evaporator Coil includes the following:
- * City & State code required heavy-duty custom (made to fit) 2 lb density insulation for sheet metal transition from the furnace to the coil. (Horizontal only)
- * Mastic duct sealer is used to seal the duct joints involved in the installation.
- * New heavy-duty composite welded auxiliary overflow pan. Pans are coated at wet ends. (Horizontal coils only)
- * Tie the main drain and overflow drains and upgrade if required to improve drainage.
- * Expansion valve is required used to balance refrigerant charge.
-
Installation of a new furnace includes the following :
- * New double wall vent pipe, cap and flashing (if required) to composition roof.
- * Stainless Steel gas flex line if required.
- * Hard pipe black gas line connection from flex gas line to gas valve to meet furnace code.
- * Mastic duct sealer is used to seal the duct joints involved in the installation.
-